UENC Project Weekly Report: #73 (May 24, 2021 — May 29, 2021)

UENC Project Weekly Report#73

1. Overview of progress

(1) Tested network architecture design and planned and discussed faucet interface and application scenario designs.
(2) Carried out the exchange listing and resolved issues related to the exchange interface.
(3) Proofread and replenished the contents of the public chain white paper, as well as developer, node deployment, and exchange listing documentation.
(4) Completed the development of some functions of v1.6.0, integrated the smart contract module with the new log management module, and optimized the node random selection algorithm.

2. Mainnet data (as of 8.30 am, 31st May 2021)

(1) Incorporated 12,485 mining machines.
(2) The height of the mainnet is 84,845.
(3) The number of transactions was 104,790.
(4) The total reward is 1,045,256.

3. Other
(1) None.

4. Summary of the current situation

The focus during this period was to resolve issues in the exchange listing and revise the white paper and developer documentation. The design and implementation of the network testing faucet function were also discussed. Some functions have been completed for V1.6.0, and some functional tests will be carried out next week. The smart contract project has been incorporated into v1.6.0. Next week the technical details of the specific implementation steps of the smart contract reading, executing, verifying, and rolling back on the chain will be discussed.